2004 Chemical dpc and structural waterproofing works undertaken at Cadogan Hall, London 2018 New build project in Goudhurst with Newton 403 Hydrobond laid on insulation layer. 2011 Internal cavity drain membrane fitted to basement wall structure 2012 Structural Waterproofing works to new build in West Sussex 2012 Geodrain external membrane fitted to new build 2014 External deck waterproofing on new build project in East Sussex 2014 External spray applied membrane on ICF construction 2016 External Geodrain membrane fitted on new build project in Otford 2016 Typical sump pump installation 2018 Newton 109LM & 410 Geodrain 2018 Installation of Newton 508 cavity drain membrane on a new build project in Tunbridge Wells. 2018 Application of Newton 109LM on a new build project near Sevenoaks 2011 Type C structural waterproofing undertaken in large basement at shopping centre in Kent 2018 Structural Waterproofing on new build project in Tunbridge Wells 2018 Newton 410 Geodrain Membrane fixed to retaining wall prior to backfill 2018 Newton 109LM spray applied on new retaining wall